Our project

Completed projects: AVENTIN Port Handling Complex of Sea Transport (6 Proektna Street, Mykolayiv); customer:

AVENTIN LLC. Target cargo turn-over: 3,750,000 tons per year. Structure of the complex:

  • Area of the territory: 27.04 ha;
  • Water area: 26.7 ha;
  • Mooring for bulk cargo N° 1, length: 280 m;
  • Mooring for liquid cargo N° 2, length: 230 m;
  • Depth near berths: 12.5 m.
  • Specialized handling terminal for grain N° 1, 180,000 thousand tons for nonrecurrent storage, cargo turnover: 2,250,000 tons per year;
  • Specialized handling terminal for oilcakes N° 2, 120,000 thousand tons for nonrecurrent storage, cargo turnover: 750,000 tons per year;

Specialized handling terminal for vegetable oil N° 3, 24,000 cubic meters for nonrecurrent storage, cargo turnover: 750,000 tons per year; “Corn Handling Terminal at the back of Berth N° 1-z near the Androsovskiy Breakwater” — customer: LLC “BRUKLIN-KIEV.” Target cargo turn-over: 40,000,000 tons per year.

Structure of the complex:

  • Area of the territory: 4.8 ha;
  • Specialized handling terminal for grain, 235,000 thousand tons for nonrecurrent storage;
  • Car unloading station for 16 cars at a time;
  • Vehicle unloading station for four posts;
  • Grain handling machine on sea transport with a productivity of 1,500 tons/hour. Working Draft of the Berth N° 1-z for General Cargo at the Androsovskiy Breakwater with Connections. Correction”; customer: Odessa Commercial Sea Port State Enterprise.

The length of the berth: 254 m.

  • Design depth near berths: 13.5 m.
  • Water area: 14.8 ha;